| Product | High Grade |
| Area of application | Special applications |
| Country | Austria |
| Location | Vienna |
| Year | 1999 |
| Floor size | 480 m2 |
| Underground conditions | No bedding |
| Additional steel reinforcement | No |
| Additional Information | The concrete layer for the cleaning and lookout platform of the Millennium Tower was originally designed with steel mats as reinforcement elements. The concrete surface in these areas is exposed to heavy stressing, and it was decided to cover it in order to protect it from the weather and abrasion. |
www.contecfiber.com/en/references/reference-database/report/18-millenium-tower/